精品无码日韩一区二区三区不卡,强奷乱码中文字幕熟女导航,超碰国产精品久久国产精品99,久久国产精品久久喷水

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

亚洲日韩欧洲乱码av夜夜摸| 国产第19页精品| 熟妇人妻一区二区三区四区| 国产日韩av免费无码一区二区| 国模少妇一区二区三区| 欧洲美熟女乱又伦免费视频| 亚洲av无码乱码在线观看牲色| 久久人妻无码一区二区| 国产69久久精品成人看| 亚洲av无码专区在线厂| 国产精品自在线拍国产| 国产精品狼人久久久久影院| 久久综合五月丁香六月丁香| 亚洲精品午夜久久久伊人| 亚洲第一天堂无码专区| 国产精品午睡沙发系列| 最新69国产成人精品视频免费| 美女张开腿让人桶| 久久夜色精品国产亚洲| 亚洲国产精品日韩av不卡在线| 亚洲精品国产高清在线观看 | 中文字幕在线播放| 国产精品久久久久久久久鸭| 久久不见久久见免费影院| 国产v综合v亚洲欧美久久| 成全影视免费观看大全二| 人妻献身系列第54部| 日本熟妇浓毛| 精品久久久久国产免费| 久久婷婷久久一区二区三区| 午夜dj高清免费观看视频| 精品无码av无码免费专区| 久久精品国产精品亚洲色婷婷| 躁躁躁日日躁| 精品国产欧美一区二区| 国产肉丝袜视频在线观看| 品色堂免费论坛| 挺进大幂幂的滋润花苞御女天下| 国产男女性潮高清免费网站| 爆乳一区二区三区无码| 丁香美女社区|