精品无码日韩一区二区三区不卡,强奷乱码中文字幕熟女导航,超碰国产精品久久国产精品99,久久国产精品久久喷水

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

中文字幕av一区二区三区人妻少妇 | 亚洲a∨国产av综合av| 无码囯产精品一区二区免费| 国产大片黄在线观看| 精产国品一二三产区| 人妻少妇精品视频专区| 大伊香蕉在线精品视频75 | 亚洲国产精品va在线看黑人| 欧美黑人巨大videos精品| 欧美人妻aⅴ中文字幕| 成av人电影在线观看| 成人精品一区二区三区中文字幕| 真人无码作爱免费视频禁hnn | 亚洲av日韩av天堂一区二区三区 | 国外b2b网站毛片| 天堂中文最新版在线中文| 综合 欧美 亚洲日本| 边啃奶头边躁狠狠躁3p| 亚洲精品自产拍在线观看| 亚洲色大成网站www久久九九| 中文字幕久久精品一区二区三区| 18禁无遮挡无码网站免费| 国产精品萌白酱永久在线观看| 18无码粉嫩小泬无套在线观看 | 亚洲av成人网站在线观看| 国产成人久久av免费| 色狠狠久久av五月综合| 久久久久亚洲av无码专区网站| 亚洲av不卡一区二区三区| 国产精品色内内在线播放| 国产9 9在线 | 中文| 精品久久久噜噜噜久久久| 好吊色欧美一区二区三区视频 | 男女后式激烈动态图片| 大地资源第一在线| 插b内射18免费视频| 人妻少妇不满足中文字幕| 女人高潮内射99精品| 国产主播一区二区三区在线观看| 人妻精品久久无码专区涩涩| 久久99精品久久只有精品|