精品无码日韩一区二区三区不卡,强奷乱码中文字幕熟女导航,超碰国产精品久久国产精品99,久久国产精品久久喷水

上海金泰工程機(jī)械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

麻豆md0077饥渴少妇| 欧美性猛交xxxx乱大交丰满| 性色欲网站人妻丰满中文久久不卡| 日本人妻人人人澡人人爽| 丰满少妇被猛烈进入| 中文有码人妻字幕在线| 一本色道久久88精品综合| 大学生粉嫩无套流白浆 | 女厕厕露p撒尿八个少妇| 亚洲性色av私人影院无码| 亚洲国产精品一区二区第四页| 男女一边摸一边做爽爽| 精品无人区一区二区三区| 欧美熟妇xxxxx欧美老妇不卡| 国产在线观看www污污污| 狠狠躁夜夜躁人人爽天天天天97 | 亚洲av电影天堂男人的天堂| 毛片无码免费无码播放| 亚洲人成色在线观看| 天堂а√在线中文在线新版| 夜夜躁狠狠躁日日躁视频| 在线观看国产成人av片| 日本欧美一区二区三区在线播放| 亚洲香蕉网久久综合影视| 国产帅男男gay网站视频| 亚洲男人在线| 中国农村熟妇性视频| 蜜臀性色av免费| 在线播放无码高潮的视频| 国内外精品激情刺激在线| 国产精品视频免费一区二区 | 亚洲日韩爆乳中文字幕欧美| 亚洲熟妇丰满多毛xxxx| 国产香蕉97碰碰久久人人| 四虎永久在线精品免费网址| 亚洲伊人久久大香线蕉av | 国产精品偷窥熟女精品视频| 三男一女吃奶添下面| 久久久久久久久久久久久久久| 99国产精品久久久久久久成人| 国产av激情久久无码天堂|